The team stays the same
The factory runs smoother with fewer interruptions, so the business can take on more work without the next hires.
About 140 people in one large building: prepress, offset, digital, large format, finishing, a mail house and despatch, with a job passing through five or six hands and about 350 jobs a week.
back across the business, about twelve people’s worth, with the same team.
today are people walking a five-minute floor to ask, check or tell. Most of that walking goes away.
back for each customer service rep, and about a quarter for the supervisors and the production planner.
no longer lost to waiting on an answer or a short sheet of stock.
Where the figures come from. Modelled on published research and industry documents, and measured where a business’s own systems gave us the numbers. Once we model your business, your own data replaces every one of them. The time is capacity for your team.
The systems each do their job. What none of them does is the work around them: the question, the chase, the handover, the redo. It is done on foot, by phone and from memory, and nobody counts it.
Every station signs the job through on a phone or a tablet, so the client’s question is answered without a walk, the operator asks at the station and gets the answer from the job record, a schedule change tells every station it touches, and the last sign-off carries the quantities and extras that draft the invoice. The handover is already on the board.
A client rings. The customer service rep walks to the floor or rings the supervisor, finds the ticket and calls back. About 280 times a week.
Prepress sends the proof, the rep chases the client, then retypes their changes into an email to prepress.
Which stock? Is this the revised file? Fold or score first? The operator walks to find out, and the press stands.
A rush job or a press fault. The planner re-sequences, then walks the floor telling each press, finishing and despatch.
Each supervisor walks the floor for 45 minutes to gather status, then the production meeting goes over it again. Twice a day.
Finance chases the final quantity, the overs and the extra work before the invoice can go.
The size of the losses in this model comes from published research, not from guessing. These are the findings behind it, with where each one came from.
Every time a person handles a job’s information it costs money and adds a chance of error. A worked example uses 10 minutes of tracking per job.
Avanti Systems; XeroxOne offset printer reported more than 40 status calls every morning before a shared system, each one a walk to the floor or a call to the supervisor.
Clicarity, GP Offset case studyThe industry’s own description of the customer service role is built around status enquiries, schedule updates and shipment confirmations. That is the work the model gives back.
PRINTING United Alliance, Customer Service RepresentativeHighly automated print businesses finish jobs 40% faster than the rest.
Smithers, via the printIQ white paperA print job passes through five or six people, and each one has to find something out: which stock, which file, where the pallet went. Office studies put looking for information at about a fifth of the week; on a print floor it is a walk to the rep or to prepress, and a press standing while it happens.
The commercial printer model; the one-fifth figure from McKinsey, checked by AinoraThe average European print provider, about 117 a day. The model uses 350 jobs a week, deliberately lower.
Keypoint Intelligence, via WhatTheyThinkAbout a third of their week back, spent with clients instead of on the floor finding out.
About a quarter of their week back. The floor walk becomes a look at the exceptions.
Fewer stops. Their gain is a machine that keeps running, not fewer hours.
Invoices drafted from the last sign-off, and the quality records written as the work is done.
The factory runs smoother with fewer interruptions, so the business can take on more work without the next hires.
A ten percent lift in volume would normally mean another rep or two, a supervisor and admin help. The model says that load fits inside the hours released.
Every sign-off, check and nonconformance lands in one record, which is the evidence quality audits ask for.
Every minute here is a planning assumption drawn from printing industry figures and a walk of the floor. The business’s own job counts, proofing rounds and shift pattern replace them at calibration. The hours are capacity, not a saving: the same team, more work, fewer interruptions.
Every model is built the way an industrial engineer studies a factory floor: list every role and every task, count how often each one happens, time it as it runs today and as it runs with Kula, and multiply out. Real volumes are used where we have them and published time values where we do not. Every figure is replaced by the business’s own data before it is used for anything, and the time given back is read from what the team actually moves onto Kula, not from asking anyone to log their day.
Every loop, the minutes behind it and the sources are in the full model. We walk through it with you in a conversation, and then build yours from your own systems and a short walk-through with one of your managers.
Book a conversation →back to the team across five clubs. The biggest share is staff questions: about 460 a week, each a walk to find the manager today.
See the model →back across the build, and the last house handed over about six months sooner.
See the model →back across the production, and a shoot day that does not have to be added.
See the model →Tell us a little about your business and we will model yours. Replies come from Phil or Peter.