A model case: construction

A hundred houses, one estate.

One builder, 100 detached houses on one estate over about 32 months, one start a week, about 26 trades through each house and about 35 subcontract businesses on the job.

Book a conversation → Modelled on industry research
Modelled
About 9,800 hours

back across the build, for the supervisors, the trades and the builder’s office.

Modelled
About 9 hours a week

back for each of the three site supervisors who carry the job in their heads.

Modelled
About six months sooner

for the last house handed over, because the same three supervisors can carry more houses at once.

Modelled
About A$1.8M

better off for the builder on the job, within a range of A$1.0M to A$2.7M: net margin from 6% to about 10%.

Where the figures come from. Modelled on published research and industry documents, and measured where a business’s own systems gave us the numbers. Once we model your business, your own data replaces every one of them. The time is capacity for your team.

A day today

The work no system does.

The systems each do their job. What none of them does is the work around them: the question, the chase, the handover, the redo. It is done on foot, by phone and from memory, and nobody counts it.

With Kula

A call-up fires only when the trade before has signed off with a photo and the delivery is scanned in. The claim is generated from that sign-off. A defect is a photo assigned to the trade that did the work. The supervisor’s diary writes itself from the day, and the trades, the office and the home buyer can all see where a house is up to without ringing anyone.

The call-up

Ring the next trade, wait, chase, confirm, then re-plan when the last trade slips. About 4,000 times across the job.

The wasted trip

A crew arrives to a house that is not ready. About one visit in eight today.

The drive to look

The supervisor drives between houses to check the last trade’s work before releasing the next one, or a payment.

The question that waits

Which tile, which plan, what colour. The supervisor answers the same question twenty times a day.

The claim

Invoice, match, query, chase. About 4,000 claims across the job, typed into the accounts, the job list and a message to the owner.

The site diary

Rebuilt from memory at the end of the day, if there is time.

What the research says

The loss is real before the model is.

The size of the losses in this model comes from published research, not from guessing. These are the findings behind it, with where each one came from.

35% of the week

About 14 hours of a construction professional’s week go to looking for information, resolving conflict and redoing work. Looking for project information alone is 5.5 hours a week. Field supervisors lose 13.7.

FMI and PlanGrid, Construction Disconnected, 2018, 599 respondents
52% of rework

Traces back to poor data and communication. A later and larger survey of 3,900 professionals put rework from bad data at 14%, which is why the rework line is the assumption the model watches most closely.

FMI and PlanGrid 2018; Autodesk and FMI, Harnessing the Data Advantage in Construction, 2021
About 5% of cost

Rework runs at about 5% of project cost on average, and from 3% to 15% across earlier studies.

Get It Right Initiative literature review, 2016; Love and Li, 2000
About 50%

Of weekly planned tasks are completed as planned without a reliable planning system. The top causes are prerequisite work not done, trade coordination and information. A call-up that fires only on a photo sign-off is the fix for the first two.

Ballard, The Last Planner System of Production Control, 2000
3 times as likely

Firms without construction software are three times as likely to spend more than 10 hours a week on admin.

Payapps, 2024, 1,000 firms
30 to 100 items

A handover defect list on a new home; 53 visible defects per new UK home in one study. Each item is logged, allocated, chased and re-verified by hand today.

Rotimi, Tookey and Rotimi 2015, reviewing Craig 2008
0.4% a year

Construction productivity growth from 2000 to 2022, against 2% for the economy, and 44% of 2,700 projects studied ended at a loss. The industry’s problem is coordination, not trade skill.

McKinsey, Delivering on construction productivity is no longer optional, 2024
Who gets the time back

The same people, a smoother day.

Site supervisors

About 9 hours a week each. Less driving to look and fewer calls to chase, so the same three people carry houses that would otherwise need a fourth supervisor.

Trades

Fewer wasted trips, paid from a sign-off within days, and one compliance file for the whole estate.

The builder’s office

Claims and variations stop being matching work. Client liaison handles exceptions only.

The home buyer

Sees the house without asking, signs a variation in minutes, walks a shorter handover list.

Beyond the hours

What else changes.

Houses finished sooner

Readiness gating takes about two weeks off each house. With supervisors carrying more houses at once, starts rise and the last house hands over about six months earlier. That is where the money is: six months less overhead and finance on the job.

Less paid for twice

Rework and return visits caused by bad information fall. Half of all rework traces back to information that was wrong or never arrived.

One record for 35 businesses

The trades work from the same record as the builder because the subcontract says so, and what the job has learned does not leave when a supervisor does.

Where the figures come from

Modelled on research, measured where we can.

Nothing on this job has been measured yet. The size of the losses comes from published construction research, the minutes in each loop are working assumptions, and the dollar figures follow from them. The first job’s own call-ups, claims and defect lists replace the assumptions. The hours are capacity for the people on the job, not fewer people.

Every model is built the way an industrial engineer studies a factory floor: list every role and every task, count how often each one happens, time it as it runs today and as it runs with Kula, and multiply out. Real volumes are used where we have them and published time values where we do not. Every figure is replaced by the business’s own data before it is used for anything, and the time given back is read from what the team actually moves onto Kula, not from asking anyone to log their day.

The full model

Every loop, the minutes behind it and the sources are in the full model. We walk through it with you in a conversation, and then build yours from your own systems and a short walk-through with one of your managers.

Book a conversation →
Other businesses we have modelled
Fitness
About 197 hours a week

back to the team across five clubs. The biggest share is staff questions: about 460 a week, each a walk to find the manager today.

See the model →
Film production
About 1,776 hours

back across the production, and a shoot day that does not have to be added.

See the model →
Commercial print
About 430 hours a week

back to the team, so the business can take on more work without the next hires.

See the model →